This article provides an introduction to the basics of Building Information Modeling (BIM), design and project delivery methods and is a primer to the construction disputes found when utilizing BIM.…
This article provides an introduction to the basics of Building Information Modeling (BIM), design and project delivery methods and is a primer to the construction disputes found when utilizing BIM.…
A construction project schedule is typically a graphic representation of how a construction project is completed and constructed. For example, a contractor’s bid estimates costs to build the…
Accurately estimating construction costs requires a thorough understanding of project specific criteria, including the scope of work, project plans, applicable specifications, scheduling, project…
Architects are tasked with providing a solution to their client’s unique building requirements. This demands an open and transparent interaction between the client and architect, particularly…
In this article, Civil Engineer and construction expert Michael J. Tuttman explores how the essential questions of “Who, What, Where, When, Why, and How” are as important for construction…
This article discusses the purpose and importance of the submittal process. The construction experts at Robson Forensic are frequently retained to provide expert witness investigations relevant to a…
In this article, experts from the architectural practice at Robson Forensic provide an overview of error and omissions change orders. The discussion includes an explanation of change orders, the…
In this article, Forensic Document Examiner, Mark Songer discusses the role of document examiners within the context of construction disputes. The article highlights examples of “cut and…
In this article, civil engineer, Michael D. Klein, P.E., CHMM, provides an introduction to the most widely accepted method for evaluating project delay/disruption claims, the Critical Path Method…
The measured mile approach of evaluating construction delay claims compares productivity during periods of a project that have been adversely impacted to the productivity levels during periods that…