Professional Experience
Robson Forensic, Inc.
Associate
2018 to present
Providing technical investigations, analysis, reports, and testimony toward the resolution of personal injury litigation involving slip, trip and fall injuries, code compliance issues, construction claims, construction materials failures, and professional liability. Areas of expertise include:
Premises Safety: Walkway construction and safety; elements of human factors relating to the built environment, effectiveness of warnings, illumination, delineation of hazards in parking lots, stairs, ramps, corridors; slip resistance of walkway surfaces, platforms and level changes; walk-off mats; power assisted doors; analysis of site and building drainage issues contributing to the formation of ice as related to slip accidents.
Conspicuousness of Hazards: Placement, effectiveness, and illumination of warnings; signage; color and contrast of adjacent materials.
Building Design and Planning: Building codes and standards; means of egress; fire protection ratings and separations, unprotected floor openings, guardrails, interior glazing, materials selection; exterior building envelope design and detailing, interior illumination.
Site Design and Planning: Site planning; submittals for zoning variances, special and conditional uses, and PUDs; grading and drainage; control of storm water; parking lot design, site lighting, walkways, site amenities.
Healthcare Facilities: Hospitals, medical offices, patient rooms, procedure rooms, medical systems coordination, public health requirements, infection control requirements
Municipal and Recreational Facilities: Police stations, fire stations, village halls, maintenance facilities, recreation centers, gymnasiums, indoor aquatics, locker rooms, steam rooms, saunas
Retail Facilities: free standing buildings, tenant build out, store planning, fixture design and installation, multi-location roll out
Religious Facilities: Worship spaces, community spaces, administrative facilities, educational facilities
Offices: freestanding buildings, tenant build out, renovation, planning, furniture systems integration
Accessibility: Barrier-free standards; Americans with Disabilities Act (ADA); accessible routes; accessible building components, including ramps, entrances, doors, toilet rooms, protruding objects, walking surfaces, curb ramps, signage, and detectable warnings.
Construction Defect Claims: Construction defects and delay claims, contractual obligations and disputes under various types of project delivery methods; standards and quality issues.
Building Envelope and Construction Materials Failures: Water intrusion related issues; EIFS, brick, stone, and concrete; gutter and flashing system failures; roofing system failures; expansion joint failures; sealant and caulk system failures, window system failures; vapor barrier system failures of walls, roofs and interior partitions, including natatoriums. International Institute of Building Enclosure Consultants Registered Roofing Consultant and Registered Exterior Wall Consultant.
Security: Site and facility planning; lighting; CCTV; door hardware; perimeter fencing.
Architectural Practice: Standard of Care, Owner-Architect Agreements, General Conditions, errors and omissions, change order analysis, construction phasing, punch lists, and interpreting contract performance.
The Dobbins Group
Project Manager
2016 to 2018
- Managed retail, warehouse, and office projects – new construction and renovation, nationwide, included lighting design, flooring selection, ADA, OSHA and building code compliance, life safety systems, elevators, stairs, pedestrian ramps, railings, seismic requirements for fixtures and finish assemblies, standard and hurricane resistant exterior finishes and glazing design, sidewalks, parking lots and site lighting
- Played a critical role in complete project management – requirement analysis, project planning, code analysis, architectural and building systems design, permitting, tracking and final delivery
- Visited project sites and organized periodical meetings to check construction progress and ensure that projects met contract requirements including construction quality and code compliance, and were running within the agreed timeframe for design/build projects and those constructed by outside contractors
- Served as Architect of Record for in-house projects including self-certifying projects for permit in the City of Chicago
Fullerton Engineering Design
Senior Project Architect
2014 to 2016
- Managed design of new and modified wireless communication facilities with key focus on rooftop and concealment applications nationwide
- Provided technical leadership and guidance for architectural design and detailing to a multidisciplinary engineering firm in accordance to clients’ requirements, applicable building codes, and design standards
- Provided building envelope consulting services for major wireless telecommunications providers related to construction defects in building mounted equipment installations
The Messina Group/Skidmore Owings & Merrill
Project Architect (Contract)
2013 to 2014
- Successfully managed firm-wide submittal review process for a new, large medical center
- Administered construction of projects on a contract basis as per finalized layouts/designs within the contract timelines
- Studied design specifications to confirm submitted construction materials and details conformed to the requirements of the contract documents, building codes, and standards for Federal healthcare facilities
Jaeger Nickola Kuhlman and Associates Ltd.
Senior Project Architect/Associate
2006 to 2013
- Managed religious, Pre K-12 educational, and office projects – both new construction and renovation including lighting design, flooring selection, ADA, OSHA and building code compliance, life safety systems, elevators, stairs, pedestrian ramps, railings, exterior finishes and glazing design, sidewalks, water feature design and code compliance, parking lots and site lighting
- Supervised project design team assignments and workflow as well as reviewed projects for code compliance and quality control across the firm’s operations
- Prepared property condition assessments for life safety, code compliance and identification of deteriorated building elements , building and site accessibility audits, contracts and changes to contractual agreements as well as managed the bidding and permit processes
- Ensured quality control standards are maintained across the site construction – conducted inspection and reviewed projects to monitor compliance with building and safety codes
The Depalma Group, Inc.
Project Manager
2005 to 2006
- Managed interior and exterior renovation projects for corporate, retail and higher education clients, included lighting design, flooring selection, ADA, OSHA and building code compliance, life safety systems, stairs, pedestrian ramps, railings, exterior finishes and glazing design, sidewalks, parking lots and site lighting
- Played a critical role in complete project management – requirement analysis, project planning, design, tracking and final delivery
- Visited project sites and organized periodical meetings to check progress and ensure that projects are running within the agreed timeframe
- Served as Architect of Record for both in-house projects and for designers from other jurisdictions including self-certifying projects for permit in the City of Chicago
Williams Associates Architects
Project Manager/CAD Manager
1998 to 2005
- Successfully managed municipal and recreational projects – both new construction and renovation including recreation centers incorporating indoor aquatics facilities, gymnasiums, fitness centers, physical and occupational therapy suites and daycare centers, village halls, fire stations, police stations, and maintenance centers
- Assisted in project scheduling, budgeting, tracking progress and managing project design team assignments and workflow
- Organized and administered standard construction details and specification notes to maintain consistent quality for the firm’s construction documents
Mizani and Associates
Project Architect
1997 to 1998
Assisted in design, planning and coordination of various single family residential, institutional and retail projects – both new construction and renovation
Anderson Mikos Architects
Project Architect
1993 to 1997
Played a key role within the team that successfully completed healthcare projects (both new construction and renovation) – assisted in design, planning, production and coordination of project documents
Professional Memberships
- American Institute of Architects
- American Society for Testing and Materials (ASTM)
- Committee F13: Pedestrian Walkway Safety and Footwear
- Subcommittee F13.50: Walkway Surfaces
- International Code Council (ICC)
- International Institute of Building Enclosure Consultants (IIBEC)
- National Safety Council - Robson Forensic corporate membership
Professional Credentials
- Registered Architect: Colorado, Illinois, Indiana, Iowa, Kansas, Kentucky, Michigan, Minnesota, Missouri, Nebraska, North Dakota, Wisconsin, Wyoming
- LEED AP Certification
- National Council of Architectural Registration Boards Accredited
- Registered Roof Consultant, International Institute of Building Enclosure Consultants (IIBEC)
- Registered Exterior Wall Consultant, International Institute of Building Enclosure Consultants (IIBEC)
- Accredited Snow Contractors Association (ASCA) Certified Professional
- City of Chicago Self-Certification Architect (2006-2011, 2016-2021)
- Certified XL Tribometrist (CXLT)
- Certified Playground Safety Inspector (CPSI)
Education
M. Architecture, Illinois Institute of Technology, Chicago, Illinois, 1993
B.S., Civil Engineering, Marquette University, Milwaukee, Wisconsin, 1990
Continuing Education
- ASTM International F2508 Participant of the Super ILS (Independent Laboratory Study) for Slip Resistance Measurements, 2024
- Series 1 of 5: Construction Failures that Affected Legal Documents,2024
- Wind Forces Part 1 through 5, 2024
- ASTM International F13 Committee meeting, 2024
- Codes – ICC and ANSI – how do they relate?,2023
- Codes - ICC and the differences in each state, 2023
- What's in your Tool Bag?, 2023
- Personal Protection Safety!, 2023
- What’s behind the wall or in the pipe?, 2023
- Head Form – Equipment for Testing the Surface Under Playground Equipment That Can Cause Head Injuries. 2023
- Slips - ASTM F2508 - ANSI/ASSE A-1264.3–2007, 2023
- How to spot and detect - Heat loss and Water Intrusion, 2023
- Level 600 Courses, Accredited Snow Contractors Association, 2023
- Ethical Leadership in Today’s Complex Business Environment, 2022
- Building Envelopes, Parts 1 through 8, 2022
- Level 500 Courses, Accredited Snow Contractors Association, 2022
- Security Planning and Design, Parts 1 & 2, 2021
- Get to Know AIA Contract Documents: Content Overview, 2021
- Design-Build: Contractual Relationships, Risks and Rewards, 2021
- Everything You Need to Know: AIA Contract Documents for Small Firms, 2021
- Key Contracting Issues in Digital Practice Design and Construction, 2021
- The AIA's New Program Management Contract Documents Family, 2021
- Level 400 Courses, Accredited Snow Contractors Association, 2021
- Understanding the Architects Standard of Care, NCARB, 2021
- Accessibility Requirements for Public Rights of Way, American Institute of Architects, 2021
- Indoor Environment Part VI: Building Commissioning, Series Conclusion and Case Studies, NCARB, 2020
- Indoor Environment Part V: Effects and Control of Asbestos, Lead, Radon, Polychlorinated, Biphenyls, and Electromagnetic Fields, NCARB, 2020
- Indoor Environment Part IV: Indoor Air Quality: Operational Activities, NCARB, 2020
- Indoor Environment Part III: HVAC, Building Materials and Microbiological Habitats, NCARB, 2020
- Indoor Environment Part II: Indoor Air Quality: Sources, Contaminants and Healthy Effects, NCARB, 2020
- Indoor Environment Part I: The Role of the Architect in New and Existing Buildings, NCARB, 2020
- Ethics and Morality in the Professional Setting, Certified Training Institute, 2020
- Level 300 Courses, Accredited Snow Contractors Association, 2020
- The Self-Certification One Day Code Modernization Class, City of Chicago, 2019
- Chicago’s Updated Building Code: The Basics for the AEC Community, 2019
- Level 200 Courses, Accredited Snow Contractors Association, 2019
- Snowmelt Processes, UCAR Community Programs, 2018
- Windy City Symposium on Building Science and Advanced Roofing Technology, 2018
- SBS-Modified Bitumen Development and Evolution
- PMMA Technology
- "Integrated Air & Water Barrier Systems,” Hanley Wood, LLC, 2018
- "Mold and Moisture Prevention,” NCARB, 2018
- "Professional Conduct,” NCARB, 2018
- "Why Buildings Fail Part V: Errors During the Construction Phase,” NCARB, 2018
- CXLT Certification Program, Excel Tribometers, LLC, 2018
- "Advanced Rainscreen Design for Moisture Management,” Hanley Wood University, 2017
- "The Self-Certification Training Class,” City of Chicago, 2016
- International Institute of Building Enclosure Consultants,” Convention and Tradeshow, 2016
- "Condensation in Wall Assemblies”
- “Moisture Migration: Causes and Cures”
- “Low Slope Roofing Vol. 1,” NCARB Monograph, 2015
- "Low Slope Roofing Vol. 2,” NCARB Monograph, 2015
- "Resilient Flooring Options for the Specifier,” Armstrong World Industries, 2013
- "Understanding the 2012 International Energy Conservation Code with Illinois Amendments,” Building and Fire Code Academy, 2012
- "Intumescent Fire Protection of Structural Steel,” Isoletek International, 2012
- "Linoleum 101: Lessons in Linoleum,” Forbo Flooring, Inc. 2011
- "Bentonite Waterproofing Materials and Applications,” CETCO, 2011
- "Concrete Brick,” County Materials Corp, 2011
- "Causes and Prevention of Efflorescence,” Brick Industry Association, 2010
- "Fire Resistance of Brickwork,” Brick Industry Association, 2010
- "Water Management in Exterior Walls,” Brick Industry Association, 2010
v. 06/16/25